Sign In | Join Free | My howtoaddlikebutton.com |
|
Brand Name : GUANGXIN
Model Number : SST-004
Certification : ISO9001
Place of Origin : China
MOQ : 1 set
Price : USD1.30 to USD2.50 per kilogram
Payment Terms : T/T, L/C, Western Union, MoneyGram
Supply Ability : 1000 tons monthly
Delivery Time : 20-35 days
Packaging Details : bundles
Descriptions : Self-support Galvanized Steel Lattice Tower and Mast
Material : Steel angle plates or tubes
Grade : Q355B, Q235B, ASTM A36, ASTM 572 GR50 or equivalent
Anti-corrosion : Hot dip galvanized finish
Tower Design : 4-legged square lattice tower or 3-legged triangle lattice tower
Assembly Method : bolting
Platforms : rest platforms, work platforms
Mount : steel tubular brackets
Design Wind Speed : 10-50m/s
Applications : GSM mobile communication, FM radio and TV transmission
Self-supporting Galvanized Steel Telecommunications Tower with Custom Designs and Manufacturing
25m to 100m Free Standing Telecommunications Lattice Tower Galvanized Steel Made
We're professional manufacturer of all kinds of communications towers and steel poles, including:
1, Free Standing galvanized steel 3-legged lattice tower, made from steel tubes or/and angular plates.
2, Self-support 4-legged lattice tower made from angle steel plates or/and tubes.
3, Guyed wire towers, square or triangle guyed towers.
4, Mono poles
5, Artificial tree monopole camouflaged towers.
6, Camouflaged monopole towers with fiberglass grille shroud on top for hiding antennas.
7, All kinds of lighting towers and street light poles.
Technical Specifications of Galvanized Steel Materials and Telecom Tower
Galvanized Steel Telecommunications Tower | ||
1. Material | ||
Weldable Structural Low Carbon Steel Plates or Tubes | ||
2. Grade | Main structure | Braces |
GB/T1591:Q345B | GB/T 700:Q235B | |
ASTM A572 Gr50 | ASTM A36 | |
EN10025: S355JR, S355J0,S355J2 | EN10025: S235JR, S235J0,S235J2 | |
3. Design Wind Speed | Up to 250 km/h | |
4. Allowable deflection | 0.5 ~1.0 degree @ operational speed | |
5. Tension strength | 470~630 MPa | 360~510 MPa |
6. Yield strength | 355 MPa | 235 MPa |
7. Elongation (%) | 24 | 20 |
8. Impact strength KV (J) | 27(20°C)---Q345B(S355JR) | 27(20°C)---Q235B(S235JR) |
Bolts & Nuts | ||
9. Grade | Grade 4.8, 6.8, 8.8 | |
10. Standards for mechanical properties | ||
10.1 Bolts | ISO 898-1 | |
10.2 Nuts | ISO 898-2 | |
10.3 Washers | ISO 6507-1 | |
11. Standards for Dimensions | ||
11.1 Bolts | DIN7990, DIN931, DIN933 | |
11.2 Nuts | ISO4032, ISO4034 | |
11.3 Washers | DIN7989, DIN127B, ISO7091 | |
Welding | ||
12. Method | CO2 Shielded Arc Welding & Submerged Arc Welding(SAW) | |
13. Standard | AWS D1.1 | |
Galvanizing | ||
14. Galvanization standard of steel sections | ISO 1461 or ASTM A123 | |
15. Galvanization standard of bolts and nuts | ISO 1461 or ASTM A153 |
Applications of Steel Towers
1, GSM, 2G/4G/5G cellular Mobile communications antennas mounting and telecom signal transmission tower.
2, FM, AM, VHF radio transmission tower.
3, TV station tower
4, Electrical power transmission and distribution pylon
5, Millitary watch tower
6, Radar Microwave tower etc.
Basic Procedures of Building A Telecom Tower
1, Site geologival investigation or survey to clasify terrain category and confirm it meets tower erection requirements
2, Design tower body and foundations
3, Test and specify the tower body and foundation by professional design and calculation software
4, Specify the tower and foundation dimensions and specifications of materials.
5, Prepare lofting and shop drawing of tower sections
6, Manufacture tower members according to the drawings and specifications.
7, Dig holes for the tower foundations and make a cement underlayer on the bottom
8, Make steel cage frames and anchorages for foundations
9, Make wooden molds for constructing concrete foundations
10, Set up grounding net with steel plates or rods around foundations.
11, Pour concrete and construct bottom blocks and pedestals
12, Dry and watering concrete foundations
13, Test the impact strength and make sure it meets the design specifications.
14, Fix tower footings to foundation pedestals and other tower members
15, Assemble tower sections and antenna brackets, ladder, rest and work platforms, lightning rod, grounding plates etc.
16, Set grouding of tower body and foundations, make sure at least 2 feet of tower must be connected with the ground net, lightning rod must be connected with grounding net through at least 2 foundations.
17, Test the straightness or verticality of tower
18, Complete if all specifications are confirmed.
![]() |
25m To 100m Telecommunication Lattice Tower Free Standing Galvanized Steel Made Images |